Proveemos soluciones profesionales de almacenamiento de energía industrial y pilas de carga para vehículos eléctricos
2013
Sala de despacho automatizada
31,600
m²de parque industrial
25,000
m²de planta de producción
Analysis:Three consecutive reports of DC main contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:When parallel or connecting to ATS, the communication resistance value is incorrect or the wiring is incorrect. In the case of parallel operation, the parallel address settings are duplicated.
Solution:Check if the wiring of the CANB interface is correct. In the event of a power outage, the normal communication resistance range for measuring the resistance value of CANB should be 60-120 ohms. The communication resistance value can be changed by adjusting the CANB DIP switch on the control board. In the case of parallel operation, set the parallel addresses in order based on the number of parallel operations, from 1 to 4.
Analysis:It is usually caused by pressing the emergency stop button.
Solution:Reset the emergency stop button. If it cannot be resolved, please contact after-sales personnel for handling.
© 2025 Shenzhen ATESS Power All Rights Reserved. 粤ICP备2023127387号 por GrowthMan
Utilizamos cookies para personalizar y mejorar su experiencia de navegación en nuestro sitio web.Al hacer clic en “Aceptar todo”, acepta el uso de cookies.Para más información consulte nuestra Política de cookies.